Billboard location YM 20-B; KM13+550 highway 5B

The billboard is located on the key highway class A from Hanoi, passing through Hung Yen and Hai Duong provinces to the port city of Hai Phong, Quang Ninh. The billboard has visibility in both directions; Especially the location is at the curve, with a view between Hanoi - Hai Phong

– Location: Planning point YM-20B, Km13+550 on the left of the highway towards Hanoi to Hai Phong, the section through Yen My district – Hung Yen.
– Visibility: Approximately 1,500m in both directions.
– Traffic density: About 200,000 – 300,000 turns/day.
– Appearance: Modern large single-legged steel plate with high quality digital printing content on hiflex canvas.
– Dimensions of the billboard surface: 20m x 10m x 2 sides = 400 m2.
– Lighting system: 36 sets of 150W led floodlights lighting 6h/day from 18h to 24h.

Related Products

News

Outdoor Advertising: Exceptional Growth in the Digital Age

Outdoor Advertising: Exceptional Growth in the Digital Age Amidst the challenges posed by the digital revolution and changing consumer behavior, the out-of-home (OOH) advertising industry has emerged as a bright spot with strong growth, affirming

FORECAST FOR OUTDOOR (OOH) ADVERTISING IN Q4 2025

FORECAST FOR OUTDOOR (OOH) ADVERTISING IN Q4 2025 The forecast for OOH advertising by the end of 2025 indicates a strong growth market, particularly in Vietnam, with OOH spending projected to reach US$97.6 million. Key