Billboard located at the crossroads of the road to Dinh Vu port

The billboard is located on the key traffic axis of Hai Phong City. It is home to many new urban areas, office areas, Dinh Vu port area, etc. The traffic density is crowded. The billboard is located at the foot of Bach Dang bridge, connecting Hai Phong highway to Ha Long, Quang Ninh.

– Form: Large plate with one foot modern steel column
– Visibility: About 700m – 800M in all three directions.
– Height from the ground to the top of the billboard 28M.
– Billboard surface material: Digital printed content on hiflex quality high quantity.
– 24 sets of 100W LED floodlights, lighting time 4h/day.
– Traffic volume: About 200,000 – 300,000 turns/day
Billboard surface size: 15m x 08m x 3 sides = 360 m2

Related Products

News

SOME MAJOR POLICY ON ADVERTISING NEED TO CHANGE

On April 11, 2024, Nguoi Lao Dong Newspaper coordinated with the Hanoi Advertising Association to organize a discussion “Solutions to promote the effectiveness of outdoor advertising” so that this activity can promote its role as