Billboard location of Quan Toan overpass roundabout, Hai Phong City

Billboard is located at the gateway of the Hai Phong City, at the roundabout at the intersection of National Highway 5 and National Highway 10. Concentrating many industrial zones, urban areas Quan Toan, Normura, Hong Bang. Near major supermarkets such as BigC, Metro, is the arterial route connecting Hanoi to Hai Phong and from Hai Phong to Thai Binh, Quang Ninh, Nam Dinh, Hai Duong.... The location of the billboard is in the bend, with a long view in both directions.

– Size of billboard surface: 20m x 10m x 2 sides = 400 m2.
– The height from the ground to the top of the billboard is 25m.
– Number of bulbs: 32 sets of 150W Led headlights, lighting time 4 hours/day.
– Form: Large plate plate with one foot of modern steel column.
– Traffic volume: About 250,000 – 300,000 turns/day.
– Surface material: Digital printing on high quality hiflex.

Related Products

News

Outdoor Advertising: Exceptional Growth in the Digital Age

Outdoor Advertising: Exceptional Growth in the Digital Age Amidst the challenges posed by the digital revolution and changing consumer behavior, the out-of-home (OOH) advertising industry has emerged as a bright spot with strong growth, affirming

FORECAST FOR OUTDOOR (OOH) ADVERTISING IN Q4 2025

FORECAST FOR OUTDOOR (OOH) ADVERTISING IN Q4 2025 The forecast for OOH advertising by the end of 2025 indicates a strong growth market, particularly in Vietnam, with OOH spending projected to reach US$97.6 million. Key